Skip to content

Aerial view of Student Experience Madrid Pozuelo at dusk

Finance.

Co-investing, joint ventures and financing for landowners and area development, with the team that will run the building at the table.

How TEN invests

TEN invests in the buildings it develops and runs, so every business case is made by the team that will operate the building.

Working with TEN

How investors work with TEN.

Co-investing

Investors take a share in a single building alongside TEN.

Joint ventures

TEN and a partner develop and own a building together, sharing the investment, the risk and the result.

Area development

TEN structures the financing for landowners who want to develop a site or a wider area, and runs the homes once open.

Reporting

Investors follow performance in real time through online reporting. Processes are ISAE 3402 Type II audited.

The investment process

From business case to exit.

  1. Business case

    TEN tests every site before money is committed. Demographic trends, financial models and figures from its own buildings show what a site can return.

  2. Structure

    TEN sets up the investment per building: a co-investment, a joint venture or financing for the landowner, with the terms agreed up front.

  3. Capital

    Most of TEN’s projects are financed with its own capital through Rinkelberg Capital, part of the same group. Pension funds, family offices and private investors invest alongside.

  4. Construction

    TEN builds with contractors it has built with before and keeps quality, planning and budget under its own control.

  5. Stabilisation and exit

    After opening, TEN’s own team runs the building. TEN usually holds it for around five years, until it is stabilised, and then exits.

In figures

12

projects

Developed, financed or run by TEN.

9

financed with own capital

Through Rinkelberg Capital, part of the same group.

5 years

usual holding period

Until the building is stabilised, then exit.

ISAE 3402

Type II certified

Financial and operational processes independently audited.

12

projects

Developed, financed or run by TEN.

9

financed with own capital

Through Rinkelberg Capital, part of the same group.

5 years

usual holding period

Until the building is stabilised, then exit.

ISAE 3402

Type II certified

Financial and operational processes independently audited.

12

projects

Developed, financed or run by TEN.

9

financed with own capital

Through Rinkelberg Capital, part of the same group.

5 years

usual holding period

Until the building is stabilised, then exit.

ISAE 3402

Type II certified

Financial and operational processes independently audited.

Projects

Financed by TEN.

Render of the apartment buildings of Living Experience Málaga from the street
Student Experience Granada with its terraced white facade and the Sierra Nevada behind

Key facts +

Student Experience Madrid Pozuelo at dusk, with the pool and running track in the courtyard

Student Experience Granada

Student Experience Granada

Granada, Spain

01 / 9

‹

›

Student Experience Granada with its terraced white facade and the Sierra Nevada behind

Student Experience Granada

Granada, Spain

19.000 m²

Size of project

520

Units

2024

Year completed

A recognised university residence of the Universidad de Granada: 520 furnished studios in the Parque Tecnológico de la Salud. Winner of Best Sustainable Student Property 2025.

Student Experience Madrid Pozuelo at dusk, with the pool and running track in the courtyard

Student Experience Madrid Pozuelo

Madrid, Spain

27.000 m²

Size of project

600

Units

2023

Year completed

600 furnished studios in Pozuelo de Alarcón, at the edge of Madrid’s Casa de Campo. Student Experience’s first location outside the Netherlands, with two BREEAM-ES Excellent certificates.

Student Experience Minervahaven seen across the water in Amsterdam Houthaven

Student Experience Minervahaven

Amsterdam, the Netherlands

25.000 m²

Size of project

600

Units

2020

Year completed

600 furnished studios in Amsterdam’s Houthaven, with solar panels in the facades on three sides and BREEAM Excellent certification.

Student Experience NDSM, a red-brick building on the NDSM wharf in Amsterdam

Student Experience NDSM

Amsterdam, the Netherlands

15.000 m²

Size of project

403

Units

2017

Year completed

403 studios in Corten steel on the NDSM wharf, Amsterdam’s former shipyard. Winner of Best New Student Housing Development in 2018.

Student Experience Amstel with its yellow rooftop sports field frame

Student Experience Amstel

Amsterdam, the Netherlands

16.000 m²

Size of project

520

Units

2015

Year completed

520 studios on the Amstel river, 15 minutes by bike from the centre of Amsterdam. The second Student Experience building and the one that shaped the concept.

Student Experience Zuidas, a white building with round windows, at dusk

Student Experience Zuidas

Amsterdam, the Netherlands

26.000 m²

Size of project

800

Units

2015

Year completed

800 studios in Amsterdam’s business district, built modular in 11 months. Open since 2015 and running until July 2027.

Render of the pool and sun loungers in the garden of Student Experience Móstoles

Student Experience Móstoles

Móstoles, Spain

23.300 m²

Size of project

484

Units

2028

Expected year of opening

484 units and 594 beds next to Rey Juan Carlos University in Móstoles, Madrid. Student Experience’s third development in Spain combines student studios and flex-living apartments on one campus.

Render of Student Experience Amstelveen seen across the water in the morning

Student Experience Amstelveen

Amstelveen, the Netherlands

18.000 m²

Size of project

500

Units

2028

Expected year of opening

500 furnished studios in Kronenburg, Amstelveen, on the site of offices that stood largely empty for years. The first building of a new campus district next to Uilenstede.

Render of the apartment buildings of Living Experience Málaga from the street

Living Experience Málaga

Málaga, Spain

27.000 m²

Size of project

191

Units

2028

Expected year of opening

191 furnished apartments next to the Teatinos campus of the University of Málaga, for professionals, expats and families. The first building developed entirely for Living Experience.

Discuss your project

Every project starts with a conversation.

Tell TEN about your site or what you want to invest in. TEN replies by email.